General Services  |  Evaluations and Cadasters  |  Public Works and Services  ]

 
SERVICES OF DRINKABLE WATER AND SEWAGE SYSTEM
 
REQUIREMENTS FOR DOMICILIARY SERVICE CONNECTION

 

  • Copy of the ownership document
  • Certificate of not owing the municipality.
  • Copy of the identity certificate of the applicant.
  • To cancel for the purchase of the meter and necessary accessories for the installation, $30.00 is required.
  • The blank form of application for water installation, that is acquired in the Municipal Treasury, costs $.30 for each one.

 

REPAIRING SERVICES OF THE SERVICE CONNECTION AS FAR AS MEASUREMENT

 

  • To inform the damage in the department of drinkable water and sewage system.
  • The inspection is carried by the municipal technicians.
  • The user is shown the materials that he/she needs to acquire for connection repairs.

 

INSTALLATION OF THE SERVICE

 

  • Installation application.
  • Inspection by the municipal technicians inorder to define the place of excavation.
  • Connection installation with materials acquired by the user.

 

CUTTING AND REINSTALATION OF THE SERVICE

 

  • Every 15 days of every month, you collect for the service of drinkable water and sewage system in the windows of the Municipal Treasury.
  • It is canceled without additional charge every 30 of every month.
  • The first of the following month you are fined $1.00, and it proceedes the cutting of the service.
  • Once the consumption letter for the service is canceled, the additional charge is carried out to the corresponding reassignment.
  • The additional charge form that is canceled in the Municipal Treasury, should be left in the department of drinkable water and sewage system.

 

COLLECTIONS

 

  • Consumption of drinkable water and sewage system.
  • Special contribution of improvements.
  • Public cleaning up.
  • Urban predial tax.
  • Rustic predial tax.
  • Lease of positions in the Municipal Market.
  • Lease of spas.
  • Lease of Municipal Places.
  • Sale of forms for evaluations, alcabalas, registrations, factory line, several works, appreciation, connections of drinkable water and sewage system.
  • Sale of stamps.
  • Patents tax.
  • Total assets tax.
  • Sale of Communicational Products (CD´S, Postcards, Tourist Guides).
  • Administrative services.

To Top ]

 
REQUIREMENTS TO CARRY OUT CADASTRAL EVALUATIONS

 

  • Copies of the identity certificate.
  • Copies of the property writing.
  • Outline of the property.

 

REQUIREMENTS TO CARRY OUT SEPERATION EVALUATIONS

 

  • Copies of the identity certificates.
  • Copies of the property writing.
  • Plan approved by planning headquarters.
  • Credit title of the predial tax.
REQUIREMENTS FOR THE DISCHARGE OF THE PREDIAL TAX FOR THIRD AGE

 

  • Copies of the identification cards of the spouses. If he/she is widower or widow will only present the survivor's identification.
  • Photocopies of the last predial tax payment letter.
  • Demonstrative certificate of the monthly revenues.
  • If he / she is pensioner; certified of the IEES.
  • If they are not retired, a sworn in declaration of revenues will be attached, carried out in front of a judge of the Civil thing or a Public Notary.
  • Application directed to the Financial Director.
  • This notification runs for all the people of the THIRD AGE that require to be benefitted of this Law, should indicate that who presented in previous years they will make it again with the purpose of verifying the survival.

This whole documentation will be presented up to November 30.

TAXES

 

The tax should be paid in the course of the respective year. The payments will be been able to make since the first of January of every year, even when the cadaster were not been emitted. In this case, the payment will be carried out with the help of the cadaster of the previous year and it will be surrendered to the taxpayer a provisional receipt. The expiration of the tributary obligation it will be December 31 of every year.
The payments that are made inclusive from January until June, will enjoy the discounts to the main tax in conformity to the following scale:

PAYMENT DATES DISCOUNT PERCENTAGE
of the 1 at January 15 10%
of the 16 at January 31 9%
of the 1 at February 15 8%
of the 16 at February 28 7%
of the 1 at March 15 6%
of the 16 at March 31 5%
of the 1 at April 15 4%
of the 16 at April 30 3%
of the 1 at May 15 3%
of the 16 at May 31 2%
of the 1 at June 15 2%
of the 16 at June 30 1%



In a same way, the payments that are made starting from the 1 of July, will support 10% of annual overcharge on the main tax in conformity with the Art. 334, according to the following scale.

PAYMENT DATES OVERCHARGE PERCENTAGE
of the 1 at the 31 of Julio 5.83%
of the 1 at August 31 6.66%
of the 1 at September 30 7.49%
of the 1 at October 31 8.33%
of the 1 at November 30 9.16%
of the 1 at December 31 10%

Once finished the fiscal year, the taxes and corresponding interests will be collected by the Moor by means of the coercive process.

 

To Top ]

 

BRING UP TO DATE OF PLANES PRELIMINARY DESIGNS FOR APPROVAL OF PLANES
PLANES APPROVAL APPROVAL OF ENLARGING OR MODIFYING PLANES
APPROVAL OF PLANES FOR HISTORICAL AREAS APPROVAL OF SUBDIVISIONS
CHANGES OF RETIREMENTS OF CONSTRUCTION CERTIFICATE TO PROFESSIONALS
CERTIFICATE OF USE COMPATIBILITY OF THE LAND AND ZONING CERTIFICATES OF CONSTRUCTION PERMITS
CERTIFICATE OF HORIZONTAL PROPERTY CERTIFIED COPY OF APPROVED PLANES
DECLARATION OF HORIZONTAL PROPERTY INFORM OF FACTORY LINES
CLOSING PERMISSION CONSTRUCTION PERMISSION
INHABITING PERMISSION AND REFUND OF THE GUARANTEE FUND PERMISSION OF GAS STATIONS OPERATION AND SERVICE STATIONS
PERMISSION FOR SEVERAL WORKS PLAN MASS
RECEPTION OF THE GUARANTEE FUND PARCEL RESTRUCTURING
RESTATING AND INFORM OF ROUTING AFECTATION REQUIREMENTS FOR THE PROFESSIONAL QUALIFICATION OF ARCHITECTS AND CIVIL ENGINEERS. PUBLIC AND PRIVATE CONTRACTORS

To Top ]

BRING UP TO DATE OF PLANES
 
For what does it serve?
To modernize planes that have expired to the two years of their approval.
How to obtain it?
  • Application in simple paper with the respective stamps and the proprietor's signature.
  • Two sets of approved planes.
  • The report of approval of planes.
  • Payment Voucher of the predial tax corresponding to the present year.
  • Inform of modernized factory line.
  • Copies of the citizenship identification and modernized voting ticket or excuse certificate, of the proprietor.
  • Copies of the writing of the property, inscribed in the Property Registration.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.
The bring up to date of planes has two year-old validity.

To the Index ]

PRELIMINARY DESIGNS FOR APPROVAL OF PLANES
 
For what does it serve?
To make previous consultations to the definitive approval of the planes.
How to obtain it?
  • Form of planes approval for construction, with the registration of the data and stamps.
  • Inform of modernized factory line.
  • Square of areas drawn in the first sheet of the project.
  • A set of planes in which consists the project clearly drawn.
  • Copies of the citizenship identification and modernized voting ticket or excuse certificate, of the proprietor.

For Residence Groups it should be presented additionally:

  • The report of feasibility of drinkable water , sewer system and electric power services, when the properties are located in the suburban areas.
  • Inform of the Planning Department, when it is qualified groups as of social interest.
  • For the Historical Areas or Inventoried Constructions, it should be presented the vindicative technical memory additionally.

How much does it delay?
Eight calendar days.

Every document will be original or certified copy.
The approval of the preliminary design has two year-old validity.

To the Index ]

APPROVAL OF PLANES
 
For what does it serve?
To carry out any construction type.
How to obtain it?
  • Form of approval of architectural and structural planes for construction with the registration of the data and stamps.
  • Inform of modernized factory line.
  • Two sets of architectural and / or structural planes (Paper A1); scales 1:100, 1:50, with squares of areas, drawn in the first sheet of the project. In the event of building with hypothecary loan, to attach three additional sets.
  • Payment voucher of the 1 x 1000 to professional schools.
  • Payment voucher of the predial tax corresponding to the present year.
  • Writings of the land or the promise of sale and purchase notariced.
  • Copies of the municipal card, RUC and professional registration.
  • Copies of the citizenship identification and modernized voting ticket or excuse certificate, of the proprietor.
  • Certificate of not owing to the modernized Municipality.

In special cases to present additionally:

  • For buildings dedicated to hotel or tourist projects, to attach the pre-feasibility certificate granted by the competent tourism authority.
  • When it is qualified groups as of social interest the granted report by the Department of Planning should be attached.
  • Certificate of environmental impact emitted by the Department of Health and Environmental Administration, for industries, gas stations, stations of service, gas distributors, cellars, mechanical shops, sawmills, block makers, florists and projects that have incidence at urban level.
  • For buildings that harbor to more than twenty five people or have more than three floors, including undergrounds, there should exist a system against fires.

In the event of embedding the Embedding Agreement should be given among the parts, properly notariced.

If the property is inventoried by the Historical Center, the architectural project of restoration, rehabilitation, reconstruction or new work will be presented in the Direction of Works and Public Services and it will contain the following thing:

  • Historical memory of the construction or of the property, pointing out the diverse interventions that have been made.
  • A set of pictures containing the characteristics of the environment of the construction, space sequence of profile, elements of ornamental interest and state of the construction.
  • Rising of the current state, containing the plants of covering of the construction to scale 1:100 or 1:200; installation indicating the state of the construction, materials and current uses, facades and necessary courts that describe the current construction.
  • Proposed project, containing location, installation in the block to scale 1:1000 or 1:2000; installation in the lot; plant of covers scale 1:100 or 1:200, architectural plants indicating the characteristics of the intervention, the proposed uses and the materials to be used; necessary cuts longitudinal and traverse minimum; facades toward the street with adjacent drawn of the two delimiters to each side; other facades toward the interior of the property; architectural and constructive details necessary for the exact understanding of the intervention; scale between 1:2 and 1:20; structural pre-designing and of facilities.

It will be used scales 1: 100 or 1: 50 except where it is indicated another scale expressly.

How much does it delay?
Eight calendar days.

The approved planes will be delivered previous cancellation of the planes approval rate (same value that the Professional Schools).
Every document will be original and / or certified copies.
The approval of planes has two year-old validity.

To the Index ]

PLANE APPROVAL FOR ENLARGING OR MODIFYING
 
For what does it serve?
To change designs, surfaces, structures or uses that were approved in the original project or to enlarge the validity of planes approved to be expired.
How to obtain it?
  • Form of planes approval for construction with stamps and data of the existent areas, amplifications and / or proposed modifications.
  • Vindicative memory of the changes or modifications.
  • Inform modernized of factory line.
  • Inform and a set of the approved planes.
  • Two copies of the modified or enlarging planes, standing out the changes and required amplifications.
  • Modernized original certificate of the Property Registration.
  • Legalized authorization of the condominium residents (in the event of horizontal property).
  • Payment voucher of the predial tax corresponding to the present year.
  • Payment voucher to Professional Schools.
  • Copies of the card of the municipal registration, RUC and professional registration.
  • Copies of the citizenship identification and modernized voting ticket or excuse certificate, of the proprietor.

In special cases:

  • If they are amplifications that commit the stability of the building, the report should be presented on the structural characteristics of the construction, signed by a structural civil engineer.

If the property is inventoried by the Historical Center, the project enlarging or restoration modifying, rehabilitation, reconstruction or new work will contain the following thing:

  • Historical memory of the construction or of the property, pointing out the diverse interventions that have been made.
  • A set of pictures containing the characteristics of the environment of the construction, space sequence of the profile, elements of ornamental interest and state of the constructions.
  • Rising of the current state, containing the plants of covering with the construction to scale 1:100 and 1:200; plants indicating the state of the construction, materials and current uses; facades and necessary courts that describe the current construction.
  • Proposed project, containing location, installation in the block to scale 1:1000 or 1:2000; installation in the lot; plant of covers scale 1:100 or 1:200, architectural plants indicating the characteristics of the intervention, the proposed uses and the materials to be used; necessary cuts longitudinal and traverse minimum; facades toward the street with adjacent drawn of the two delimiters to each side; other facades toward the interior of the property; architectural and constructive details necessary for the exact understanding of the intervention; scale between 1:2 and 1:20; structural pre-designing and of facilities.
How much does it delay?
Eight calendar days

Every document will be original or certified copy
The approval of enlarging or modifying plane have two year-old validity.

To the Index ]

APPROVAL OF PLANES FOR HISTORICAL AREAS
 
For what does it serve?
To restore, to rehabilitate or to preserve their construction.
How to obtain it?
  • Form of approval of planes with the registration of the data and stamps.
  • Inform of modernized factory line
  • Rising of the current state of the existent construction, diagnosis and conservation state.
  • Architectural proposal of intervention.
  • Descriptive and vindicative technical memory of the intervention including photographic memory and schematic courts that incorporate next roads and contiguous constructions.
  • Two sets of architectural planes. In the event of requiring credit, to attach three additional sets.
  • Payment voucher of the 1 x 1000 to the Professional Schools.
  • Payment voucher of the predial tax corresponding to the present year.
  • Writings of the land or purchase commitment - sale.
  • Copies of the citizenship identification and modernized voting ticket or certificate of the proprietor's excuse.
  • Copies of the card of the municipal registration, RUC and professional registration.
How much does it delay?
Eight calendar days

Every document must be original or certified copy.
The approval of planes for historical areas has two year-old validity.

To the Index ]

APPROVAL OF SUBDIVISIONS
 
For what does it serve?
To carry out the subdivision of a property until a maximum number of 10 lots.
How to obtain it?
  • Form of subdivisions with the registration of data and stamps.
  • Inform of modernized factory line.
  • Property Title inscribed in the Property Registration.
  • Modernized original certificate of the Property Registration.
  • Inform of feasibility of basic services: water and sewer system for properties located in the areas that don't have these services.
  • Payment Voucher of the predial tax corresponding to the present year.
  • Six copies of the plane of the urban proposal.
  • Valued chronogram of infrastructure works execution in case that they are projected streets or passages.
  • Copies of the municipal registration card, RUC and professional registration.
  • Copies of the citizenship identification and modernized voting ticket, or excuse certificate, of the proprietor.

To retire the requirement, to present:

  • Writing of communal areas in favor of the Municipality (in the event of being required).
  • To carry out the payment of the 1 x 1000 of the professional schools.
  • In the event of projecting streets or passages to attach the mortgage writings in favor of the municipality of the lot or lots that guarantee the execution of works, bank guarantees or policies of ensuring.
  • In the event of partition originated in succession by reason of death the sentence of effective possession inscribed in the Property Registration will be required.
  • In the event of partition for donations to present the sentence or notarial records of donation.
  • In the event of judicial partition among coproprietors must be presented the partition demand with their respective qualification.

If the property is inventoried by the Historical Center for the subdivision proposal there will be taken into account the following dispositions:

  1. The edificable land of a protected property is susceptible of subdivision if it fulfills the requirements that this Title demands for the division of the land. If the property was subdivided, the protected construction will conserve an area free of the same or bigger land to the surface built in the low plant.
  2. The protected constructions will be able to be considered as communal equipment, in any event it should be maintained a proportion of free area not inferior to the signal one in the previous parenthesis. The whole affected area, of these constructions, could be able to be considered as communal area.
  3. The subdivision of predial built units is allowed only when they are constituted by several constructive units that don't integrate an unitary group of morphological, functional or stylistic character and whenever they don't cut themselves cracked or units with structural continuity.
  4. They are excluded of this norm the groups or monumental constructions (MH) and of special interest (PH). These properties with constructions classified as of absolute protection they won't be been able to subdivide in any way, neither to add new construction, unless this is accessory or provisional for uses of security, information or maintenance.
How much does it delay?
Twenty one calendar days

Every document will be original or certified copy.
The Direction of Works and Public Services will be able to require, in special cases determined by these, other certifications or documents in order to assist the presented application appropriately.
The approval of subdivisions has two year-old validity.

To the Index ]

CHANGES OF CONSTRUCTION RETIREMENTS
 
For what does it serve?
To homologate the urban structure of the city encircling to the reality.
How to obtain it?
  • Application of construction retirements changes with the registration of data and stamps.
  • Inform of modernized factory line.
  • Photographic memory of the group that justifies the tendency.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

CERTIFICATE TO PROFESSIONALS
 
For what does it serve?
To certify that the professional has presented requirements in the Direction of Works and Public Services.
How to obtain it?
  • Application in simple paper with the respective stamps.
  • Copies of the citizenship identification and copies of the modernized voting ticket, or certificate of the proprietor's excuse.
How much does it delay?

Eight calendar days.

Every document will be original or certified copy.

To the Index ]

CERTIFICATE OF USE COMPATIBILITY OF THE LAND AND ZONIFICATION
 
For what does it serve?
To determine the operation compatibility of an establishment with the use of the land assigned to a certain sector.
How to obtain it?
  • Application in simple paper with the respective stamps detailing: type, name or social reason, location of the establishment and activity.
  • Inform of modernized factory line.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

CERTIFICATES OF CONSTRUCTION PERMISSION
 
For what does it serve?
To certify buildings in construction, the same ones that are completing the requirements requested by the Municipality.
How to obtain it?
  • Application in simple paper with the stamps.
  • Detail of the work, location and date of its beginning.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

CERTIFICATE OF HORIZONTAL PROPERTY
 
For what does it serve?
To certify if a property is declared in horizontal property.
How to obtain it?
  • Application in simple paper with its respective stamps.
  • Location outline with data of the property.
  • Payment voucher of the predial tax corresponding to the present year.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

CERTIFIED COPY OF APPROVED PLANES
 
For what does it serve?
To obtain certified copies of approved planes, in the number that the user requires.
How to obtain it?
  • Application in simple paper with stamps, pointing out the year and the name of he /she, who was approved the planes.
  • Copies of the Payment voucher of the predial tax of the present year.
  • To cancel the rate for administrative services.
  • Copies of the citizenship identification and voting ticket, or certificate of the proprietor's excuse.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

DECLARATION OF HORIZONTAL PROPERTY
 
For what does it serve?
The regime of horizontal property, consists on the legal individualization of the component units of a construction. These units can be: housings, warehouses, offices, parkings, cellars, etc.

It serves to pass over the domain in independent form of the units of a property.

How to obtain it?
  • Form of horizontal property with the registration of data and stamps.
  • Inform of constructions planes approval (original or certified copy).
  • A complete set of approved architectural planes of all the constructions in original or certified copy.
  • An original and two copies of the charts of: aliquot, boundaries and communal areas, signed by an architect or engineer.
  • Writings of the land with inscription in the Property Registration.
  • Modernized original certificate of the Property Registration.
  • Payment voucher of the predial tax corresponding to the present year.
  • Copies of the card of the municipal registration, RUC and professional registration.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
  • Payment of the 1 x 1000 to the professional schools.

In the event of companies there also be presented:

  • Copies of the legal representative's appointment.

How much does it delay?
Fifteen calendar days.

Every document will be original or certified copy.
The approval of the declaration of horizontal property has two year-old validity.

To the Index ]

INFORM OF FACTORY LINE
 
For what does it serve?
To obtain basic data of a property:
  • It provides parameters for divide into lots or to urbanize
  • Available area to build the low plant (COS)
  • Maximum area of construction (CUS)
  • Maximum height of allowed construction
  • Maximum number of housing units
  • Construction withdrawal that should be respected
  • Uses of the allowed and forbidden floor
  • Readiness of basic services
  • Reference of factory line

The factory line is the necessary document to carry out most of the procedures in the Direction of Works and Public Services, as well as to buy or to sell a property, to fraction, to build and to know if the property is affected or not by routing traces.

How to obtain it?
  • To acquire in the Direction of Works and Public Services the form of factory Line.
  • To register the data of the property and to attach a copy of the Payment voucher of the predial tax.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
  • For the suburban areas, to attach the exact localization of the property in a cartographic sheet from the IGM to scale 1:5.000 or 1:25.000 and the writings inscribed in the Property Registration.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.
The document of factory line has a two year-old validity.

To the Index ]

CLOSING PERMISSION
 
For what does it serve?
To build the closing of a property on its front, lateral or posterior side.
How to obtain it?
  • Closing form with the registration of data and stamps.
  • Inform of modernized factory line.
  • Copies of the writing inscribed in the Property Registration.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.

If the property is inventoried by the Historical Center it will also attach the design of closing drawn in appropriate scale and photographic memory of the construction.

To retire the procedure there must be cancelled the corresponding rate.

How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

CONSTRUCTION PERMISSION
 
For what does it serve?
To obtain the authorization for construction execution.
How to obtain it?
  • Permmission of Construction Form with the registration of data and stamps.
  • Inform of architectural and / or structural planes approval (original or certified copy).
  • Inform of factory line.
  • Payment voucher for approval of planes.
  • Deposit Voucher of guarantee fund (1% cash of the value of the CAE-I).
  • Payment voucher for facilities of drinkable water and sewer system.
  • Payment vouchers to the professional schools.
  • Form of construction surveys of the INEC.
  • Certificate of not owing to the Municipality, modernized.
  • A set of approved architectural planes (original or certified copy).
  • Two sets of structural planes with the registration of professionals' signatures.
  • Two sets of electric and hidro-sanitaries facilities planes with the registration of professionals' signatures.
  • Payment voucher of the predial tax corresponding to the present year.
  • Copies of the card of the municipal registration, RUC and professional registration.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.

For projects bigger than four floors, included undergrounds, to present:

  • Original and two copies of the technical memory sheet of the structural calculation (form).
  • Inform emitted by an engineer of floors.
  • Excavation system with processes to be continued.

The permission has validity for the time that the work lasts.

The proprietor is forced to maintain in the work a complete set of approved architectural and structural planes. Also, it is forced to place a sign in the property in which consists the identification of the project, the architectural, structural planners' names and of facilities, number of the report of planes approval and number of the construction permission.

How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

INHABITING PERMISSION AND REFUND OF THE GUARANTEE FUND
 
For what does it serve?
To authorize that a construction enters in service. This document allows to retire the guarantee fund.
How to obtain it?
  • Form of inhabiting with the registration of data and stamps.
  • A copy of the approved architectural planes.
  • Inform of planes approval.
  • Construction permission.
  • Original of the guarantee fund reception voucher.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
  • For refund of the guarantee fund in cash, it should be requested in writing and with stamps to the Financial Direction.

    Notes:

  • In the event of constructions of more than six housing units there must be also attached the result of the resistance test of the concrete starting from the third level and permission of occupation of the Firemen Body.
  • For stations of service, gas stations, industries, cellars, florists and special trade will be attached the definitive report of the Department of Health and Environmental Administration and occupation permission of the Body of Firemen.

How much does it delay?
Eight calendar days subject to inspection.

Every document will be original or certified copy.

To the Index ]

PERMISSION OF OPERATION FOR GAS STATIONS AND SERVICE STATIONS
 
Inform of feasibility of the installation
For what does it serve?
To see the feasibility of construction of gas and service stations.
How to obtain it?
  • Application subscribed by the proprietor or legal representative.
  • Modernized inform of factory line.
  • Purchase-sale writing or properly registered lease contract (minimum term 5 years old).
  • Inform of the Department of Evaluations and Cadasters on the existence or not of gulches or fillers.
  • Location plane of the land to scale 1:1000, based on the official plane of the IGM, with reference of streets, avenues and sidewalks in a radius of 250 m.
  • Topographical plane of the property.
  • Cartographic plane of the Military Geographical Institute (IGM) Esc. 1: 25000 and location of the property (in suburban areas).
  • Inform of the Department of Drinkable Water and Sewer system for stations of service that include lubrication service or vehicles washer.
  • Inform of the Department of Planning when the use of the floor is conditioned with the use of the floor for the sector.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

Approval of the definitive project
For what does it serve?
To authorize the construction of gas stations and service stations.
How to obtain it?
  • Form of the definitive project with the registration of data and stamps.
  • Payment voucher to the professional schools.
  • Inform of modernized factory line.
  • Inform of feasibility of the installation.
  • Notarized purchase-sale or lease contract for the five year-old minimum lapse.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
  • Favorable inform of the environmental diagnosis granted by the Department of Health and Environmental Administration.
  • Inform of suitability of the Firemen Body.
  • Favorable inform of the Department of Drinkable Water and Sewer system.
  • Vindicative technical memory of the project.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

PERMISSION FOR SEVERAL WORKS
 
For what does it serve?

To carry out increases up to forty square meters in the existent constructions and for a single time in new work, without it means the increment of housing units or overcome the height in the allowed construction, respecting the CO and the CUS.

It also serves to carry out modifications, demolitions, repairs or remodelings in the existent constructions that don't imply structural changes or of use of the floor.

How to obtain it?
  • Form of several works with the registration of data and stamps.
  • Inform of factory line, modernized.
  • Location outline.
  • Payment voucher of the predial tax corresponding to the present year.
  • Descriptive plane of the increase or construction to be carried out (in new works).
  • Writings of the land or modernized original certificate of the Property Registration, in the event of house built and / or notariced promise of purchase-sale.
  • When it is condominiums, it should be attached the notariced authorization of the coproprietors in conformity with the Law of Horizontal Property.
  • For new work, to present the report and the approved planes of the existent constructions.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
  • Certificate of not owing to the modernized Municipality.

To retire the permission there must be cancelled the corresponding rate.

How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]

PLAN MASS
 
For what does it serve?
To approve the general proposal of the project (plan mass), in residence groups and constructions that will be declared in horizontal property.
How to obtain it?
  • Form of approval of planes for construction with the registration of data and stamps.
  • Inform of factory line, modernized.
  • Writings of the property, properly inscribed in the Property Registration.
  • Four copies of the general installation and the schematic proposal of the project.
  • Two copies of the areas chart incorporated to the plane, containing in number of housings, trade or offices, etc., the COS and CUS, number of parkings, communal areas, roads, etc.
  • The reports of feasibility of drinkable water, sewer system and electric power services, when it is properties located in suburban areas.
  • For qualified groups as social interest, it will also be attached the respective qualification of the Department of Planning.
  • Copies of the card of the municipal registration, RUC and professional registration.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.
The approval of the plan mass has two year-old validity.

To the Index ]

RECEPTION OF THE GUARANTEE FUND
 
For what does it serve?
To enter the values, policies of sure, bank guarantees, mortgages, garments and fiduciary papers that aid the faithful execution of the planes approved in the development of a construction.
How to obtain it?
  • Bank guarantee or sure policy of the proprietor.
  • Schedule for guarantee fund directed to the Municipal Treasurer.
  • Copies of the report of planes approval.
  • Copies of the Payment voucher of the predial tax corresponding to the present year.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.

If the predial tax consists with another name, it will present certified copy of the writing.

How much does it delay?
Immediate.

Every document will be original or certified copy.

To the Index ]

PARCELING RESTRUCTURING
 
For what does it serve?
To give better utility to the properties changing the limits of the property.
How to obtain it?
  • Parceling restructuring form with the registration of data and stamps.
  • Inform of factory line, modernized.
  • Property titles properly inscribed of all the involved lots.
  • Original certificates of obligations granted by the Inspector of the Property, of all the lots.
  • Payment vouchers of the predial tax of all the lots, corresponding to the present year.
  • Six copies of planes in which consist the current situation and the restructuring proposal.
  • The valued chronogram of the execution of infrastructure works in the event of being projected streets or passages.
  • The payment of the 1 x 1000 of the cost of the works, according to the CAE-I, to continue the process in the legal area.
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
How much does it delay?
Fifteen calendar days.

Every document will be original or certified copy.

To the Index ]

RESTATE AND INFORM OF ROUTING AFFECTATION
 
For what does it serve?
To determine the line of factory of a property.
How to obtain it?
  • Application in simple paper and outline referencial of location of the property with their respective stamps.
  • Inform of factory line, modernized.
  • Writings of the land, inscribed in the Property Registration.
  • Location planes of the property to scale 1:25000 (parishes).
  • Topographical rising (for requirement of the Direction of Works and Public Services).
  • Copies of the citizenship identification and modernized voting ticket, or certificate of the proprietor's excuse.
How much does it delay?
Fifteen calendar days.

Every document will be original or certified copy.

To the Index ]

REQUIREMENTS FOR THE PROFESSIONAL QUALIFICATION OF ARCHITECTS AND CIVIL ENGINEERS. PUBLIC AND PRIVATE CONTRACTORS.
 
For what does it serve?
To consent to work as contractor of the Municipality and in the private sector.
How to obtain it?
  • Copies of the title and card professionals.
  • Certificate of being a day in the payments to the respective professional schools.
  • Copies of the citizenship identification, voting and RUC.
  • To fill the inscription application.
  • To pay in the Municipal Treasury the value of USD 10.00 for inscription.
  • Two pictures to color, size card.
How much does it delay?
Eight calendar days.

Every document will be original or certified copy.

To the Index ]